Performance Guarantee Contract
A Performance Guarantee Contract guarantees the post retrofit performance of the system throughout the tenure (no. of years) of the contract.
Daikin will undertake to provide the full turn-key scope of the project retrofit implementations and the subsequent measurement and verification (M&V) of the system performance.
Highlights
- Pre- & Post-retrofit Audit Measurements
- Full project turn-key implementation scope including the following:
– Front end design development works
– Installation and commissioning of new, highly efficient chiller plant and air distribution system
– Maintenance of retrofitted air-conditioning system
3. Guaranteed energy savings over the tenure of the contract
4. Monthly operations report incorporating the following:
– Monthly system efficiency achieved, key equipment operating parameters etc.
– Graphical plots of all key operating parameters
– Analysis of air-conditioning system operations
5. Yearly computation/compilation of overall system performance and achievement of contractual obligations over the tenure of the contract
Benefits
Energy Savings
- Guaranteed energy savings to be reaped with implementation of our full solutions measures
- Reduce carbon emissions
Costs Savings
- Guaranteed costs savings over the tenure of the contract
- No risk of shortfall in savings
Efficiency Improvement
Air-conditioning system operations and maintenance undertaken by Daikin over the tenure of the contract